GTT announces that it has received an order from its partner the Korean shipyard Hyundai Heavy Industries for the tank design of three new LNGCs.

As part of this order, GTT will design the tanks of the vessels, which will each offer a capacity of 200,000 m3. The tanks will be fitted with the GTT Mark III Flex+ membrane containment system, a technology developed by GTT.

The vessels are scheduled for delivery during first, second and fourth quarters of 2025.

Source: Hellenic Shipping News